Opened in 1932
Supplied with a 100' platform, a 20 ton weighbridge and a loading bank when opened.
Today the remains of the loading bank can still be seen.
Opened in 1932
Supplied with a loading bank and siding when opened.
Today the remains of the loading bank can still be seen.
Opened in 1932.
Supplied with a 100' platform, 20 ton weighbridge and a loading bank when opened.
Opened in 1932.
Supplied with a 100' platform, a 1339' crossing loop, stock yards and a loading bank when opened.
Travelling water tanks were to be conveyed by Mixed - Goods trains and 15 minutes was allowed at Crooble to take water and for ashpit attention.
Opened in 1932.
Supplied with a 100' platform, stock yards and a loading bank when opened.
Opened in 1932.
North Star is the terminus for current operations.
Supplied with a 100' platform, 1474' crossing loop, stock yards and a loading bank when opened.
Opened with a 20' platform only which suggests that it was a stopping point for the passanger train servicing a local property only.
Closed: ??
Opened in 1932.
At opening supplied with a loading bank only.
Opened in 1932.
At opening supplied with stock loading facilities only.
Renamed Wearne ??
Opened in 1932.
Supplied with a 205' Platform and station building, 907' crossing loop, a 50' turntable, coal stage, watering facilities, a 20 ton weighbridge, a 30' x 12' Goods Shed, Stock loading facilities, a loading bank and a Station Master in charge.
Services were suspended in 1987 between North Star and Boggabilla when flooding damaged the track.